FABRICATION & GLASS ERP ENGINE • ALUMINIUM & uPVC

Windows & Doors Fabrication in Saudi Arabia — Estimates to Site Invoicing

Manage your complete manufacturing business in one unified ERP platform. From CRM Lead capture and Quick Estimation Calculators to Project Conversion, BOM/BoQ, Warehouse Material Requisition, WIP, Cutting Orders, QA, Delivery Gate Passes, Automated WhatsApp Payment Reminders, Billing, and Real-Time Project P&L.

CRM & Quick Calculator
Dynamic BOM / BoQ
Warehouse & WIP
WhatsApp Automation
Real-Time Project P&L
14-STEP WORKFLOW STATUS

Live Workshop Engine

WHATSAPP INTEGRATED
Dynamic BOM
Auto-Linked
Profiles & Glass
Project P&L
Real-Time Income
Revenue Recognized
CRM • WhatsApp • QA • Delivery • Reminders
Synced →
End-to-End Operational Spectrum

End-to-End Windows & Doors Workflow

FINAC connects every department — from customer inquiry and estimation to factory floor fabrication, delivery gate passes, automated WhatsApp payment reminders, billing, and after-sales service.

PHASE 1

Sales, Estimation & Project Conversion

Step 01

CRM & Lead Management


Capture client inquiries, architectural drawings, site measurement schedules, and lead follow-up logs.

Auto Lead Greeting
Step 02

Quick Calculator Estimator


Run custom calculation rules for Aluminium/uPVC profiles, window structural styles, glass & latches.

WhatsApp Quote PDF
Step 03

Project Conversion & Contract


Convert estimates into approved proposals, collect advance deposits, and issue official job orders.

Advance Deposit Receipt
PHASE 2

BOM Planning, Warehouse & WIP

Step 04

BOM / BoQ Generation


Automated multi-level Bill of Materials for raw profiles, glass panes, rubber gaskets & hardware kitting.

Step 05

Warehouse Raw Requisition


Issue raw bar profiles, glass sheets, and hardware accessories from main store to factory floor.

Step 06

WIP Management


Track factory floor WIP inventory valuation, station material issues, and GL WIP balance.

PHASE 3

Cutting, Fabrication & Quality Inspection

Step 07

Cutting Order & Optimization


Profile cut length sheets, sash frame dimensions, mullion splits, and barcode label printing.

Step 08

Assembling & Fabrication


Machining, drainage routing, corner crimping/welding, glass unit fitting, and gasket insertion.

Step 09

QA Inspection & Audit


Dimension verification, corner crimp strength check, glass seal audit, and QC pass tagging.

Dispatch Readiness Alert
PHASE 4

Dispatch, Installation & WhatsApp Payment Reminders

Step 10

Delivery Challan & Gate Pass


Printed vehicle gate passes, partial site dispatches, driver logs & delivery notes.

WhatsApp Delivery Gate Pass
Step 11

Site Installation & Handover


Site installation crew allocation, anchoring/sealing, installer sign-off & warranty issue.

Step 12

Billing & Retentions


Milestone sales progress invoices, tax invoices, 10% retention ledger & cash receipts.

Tax Invoice & WhatsApp Bill
Step 13

After-Sales & Reminders


Warranty claims, hardware adjustments, and scheduled automated WhatsApp payment reminders.

WhatsApp Payment Reminder
PHASE 5

Financial Profitability & Real-Time P&L

Step 14 REAL-TIME FINANCIAL ENGINE

Project P&L & Financial Profitability

FINAC automatically consolidates contract revenues, profile BOM costs, glass procurement, workshop labor, delivery gate pass dispatches, and retention hold ledgers into an instant, error-free Project P&L Statement.

Revenue Recognition • Progress AR
Direct Material & Glass COGS
Shopfloor Labor Piece-Rates
WhatsApp Receipts & Reminders
LIVE PROJECT FINANCIAL MONITOR GL AUTOMATED
CONSOLIDATED NET PROJECT MARGIN
+24.8% +4.2% vs Budget
Contract Revenue: Rs. 18.50M
Raw Materials & Glass: Rs. 11.20M
WIP & Fabrication Labor: Rs. 2.70M
Net Profit Income: Rs. 4.60M
Deep-Dive Module Showcase

Key ERP Features for Windows & Doors Fabricators

Every core operational module designed specifically to eliminate fabrication errors, track Work In Progress (WIP), automate WhatsApp alerts, and maximize project-wise income.

1. CRM, Estimate Calculator & WhatsApp Quote Sharing

Capture customer leads, architectural drawings, and run custom calculation formulas based on window structural styles, frame materials, glass specs, and latches — generating an automated multi-level Bill of Materials (BOM) & BoQ with 1-click WhatsApp quote sharing.

WhatsApp Lead Greeting
Auto-send instant WhatsApp welcome message & measurement intake link.
Automated Dynamic BOM / BoQ
Instantly breaks down raw profile meters, mullions, glass panes & rubber gaskets.
Material & Finishing Matrix
Aluminium (Powder Coated, Anodized, Wood Finish), uPVC & Thermal Break.
WhatsApp Quote PDF Delivery
Send formal proposals & revision summaries directly to customer WhatsApp.

CRM & Estimation Summary

Quote #EST-9042
  • Lead Customer: Al-Rehman Builders
  • Profile Series: Aluminium 3-Track Sliding
  • Glass Specification: Double Glazed (IGU 6+12A+6)
  • WhatsApp Delivery: Quote PDF Sent
Project Status: Proposal Approved • BOM Generated

2. Warehouse Requisition & WIP Management

Issue raw bar profiles, glass sheets, and hardware accessories from the main store to the factory floor. Maintain strict visibility over Work In Progress (WIP) valuation and GL accounting.

Store Material Requisitions
Transfer raw inventory from main store to factory WIP upon job release.
Shopfloor WIP Valuation
Accurately values raw profiles, glass, and labor tied up in unfinished jobs.
Hardware Kitting Reservation
Reserves latches, handles, friction stays & rollers directly against job orders.
Finished Goods Conversion
Automatically moves completed windows from WIP to FG inventory upon QC sign-off.

WIP Inventory Summary

WIP Active
  • Profiles Issued to WIP: 4,280 Linear Meters
  • Hardware Kitting: 100% Reserved
  • GL WIP Valuation: Rs. 3,400,000
Workshop Floor Control: 100% Accounted • Zero Stock Loss

3. Cutting Order, Workshop Fabrication & QA

Generate shopfloor Cutting Orders detailing profile cut lengths, sash dimensions, mullion splits, and routing sheets for workshop stations. Perform final Quality Assurance (QA) before delivery with automatic WhatsApp dispatch alerts.

Profile Cut Length Sheets
Automated cut sheets for outer frames, sashes & glazing beads.
Station Routing Pipeline
Cutting → Drainage Punching → Corner Crimping → Glass Assembly.
Barcode Label Printing
Print barcode labels for cut profile sections & glass panes.
WhatsApp Dispatch Readiness
Auto-notify customer & site engineer on WhatsApp when order passes QA.

Cutting & QA Summary

QC Passed
  • Outer Frame Cut Dimensions: 2x2,400mm / 2x1,800mm
  • Sash Mitre Cuts: 4 Cuts (45° Mitre Angle)
  • WhatsApp Alert: Alert Sent to Site
Dispatch Readiness: QA Inspection Complete • Ready for Site

4. Delivery Challan, Gate Pass & WhatsApp Logistics

Generate official Delivery Challans (DC) and site gate passes for full or partial window dispatches. Automatically trigger WhatsApp delivery gate passes with driver contact and vehicle registration details.

WhatsApp Gate Pass Delivery
Auto-send driver gate pass & vehicle info directly to site engineer.
Itemized Delivery Challans
List specific window frame IDs, glass panels & accessories shipped.
Site Installation Tracking
Assign installation crews, track site anchoring & silicone sealing.
Installer Sign-Off Receipts
Digital confirmation of site delivery receipt & customer sign-off.

Dispatch & Gate Pass Summary

Challan #DC-904
  • Dispatched Frames: 24 Casement Windows
  • Vehicle / Driver: LES-408 / M. Tariq
  • WhatsApp Delivery Alert: Sent to Site Engineer
Dispatch Audit: Gate Pass Issued • Delivery Confirmed

5. Billing, Automated WhatsApp Reminders & Project P&L

Issue tax-compliant sales invoices linked to project milestone completion, manage 10% retention ledgers, log warranty tickets, and trigger automated scheduled WhatsApp payment reminders.

Milestone Billing Invoices
Generate advance, supply, and installation progress sales invoices.
Scheduled Payment Reminders
Schedule automated WhatsApp reminders for due invoices & retention holds.
Retention Hold Ledger
Automatically track 10% retention hold payments due upon defect clearance.
Project-Wise P&L Income
Real-time revenue recognition & project net profit margin statements.

Billing & Financial Summary

Project #PRJ-882
  • Contract Revenue: Rs. 18,500,000
  • Payment Reminder Status: Auto Scheduled (Due 5 Days)
  • After-Sales Warranty: Active (10-Yr Frame / 5-Yr Glass)
Project Net Profitability: +24.8% Net Project Income Margin
Summary Matrix

Windows & Doors Fabrication ERP Matrix

A quick reference guide mapping each core module feature to its operational impact.

Module Feature Capability Description Business Impact
CRM Leads & Instant WhatsApp Capture inquiries, drawings, site measurements & auto-send WhatsApp greeting. Instant Lead Response & Higher Conversion
Quick Calculator & Dynamic BOM User-configured formulas for Aluminium/uPVC, glass & hardware with WhatsApp quote PDF. 100% Accurate Quotes & Fast Approval
Store Requisition & WIP Mgmt Raw profile transfers, factory WIP valuation & GL WIP accounting. Zero Untracked Factory Floor WIP
Cutting Order & QA Profile cut length sheets, station work orders & WhatsApp dispatch readiness alert. Zero Workshop Measurement Errors
Delivery Gate Pass & Logistics Site delivery gate passes, partial dispatches & WhatsApp driver tracking links. Complete Site Transport Audit
Scheduled Payment Reminders Automated scheduled WhatsApp payment reminders for due invoices & retention holds. 65% Faster Payment Collections
Project-Wise Income & P&L Consolidated contract revenue vs actual material, labor & logistics cost. Real-Time Project P&L Income
ENTERPRISE CLOUD ERP

Connect your entire business with FINAC ERP

Unify your sales, purchasing, inventory, manufacturing, HR, and accounting into one real-time cloud brain — with zero per-seat user fees.

FINAC CLOUD ACTIVATION
READY
User Licensing Fee
⃁ 0 (Unlimited)
Multi-Branch Sync
Real-Time Cloud
Tax & ZATCA Status
100% Compliant
General Ledger Posting
Automated 0.1s
Enterprise 256-bit Encryption • Audit Ready
WhatsApp Chat